LeverageMode tracks environmental filings, building permits, and public inquiries for new AI data center sites across France and the EU — months before the groundbreaking photo. Every alert is confidence-scored and linked to its source.
Built for vendors selling into the buildout — not real estate funds.
The reframe
By the time a €75B commitment makes Bloomberg, every vendor in Europe is calling the same three contacts. The real opportunity sits earlier — in ICPE environmental dossiers, Sitadel permit records, and enquêtes publiques — filed by SPVs nobody's heard of, for capacity nobody's announced yet.
How a signal becomes an alert
An ICPE environmental filing, Sitadel building permit, or enquête publique notice is lodged for an industrial site with a high-power-draw classification.
The filer — often an unfamiliar SPV — is checked against BODACC incorporations, land registry, and prior filings to trace it back to a parent developer or operator.
Capacity, site status, and corroborating signals (grid connection requests, hiring, press) combine into one of three tiers: Confirmed, Probable, or Speculative.
Routed to saved triggers by region, capacity threshold, or tier — in your inbox or Slack, with a link to every source document behind the score.
No black-box scores
Five to ten times more sites enter early filing than ever get built. Rather than pretend that noise doesn't exist, we show you exactly which tier a signal has earned — and every source behind it.
Multiple independent sources agree: permit, filing, and press or capex disclosure all point to the same site.
Strong single-source evidence — an ICPE filing or enquête publique — without independent corroboration yet.
Early filing only. Highest upside if it converts, highest chance it's shelved. Shown, never hidden.
Built for
Early access opens region by region, starting with Hauts-de-France and Île-de-France. Sign up to be notified.