LEVERAGEMODE
leveragemode.ai
France & EU AI buildout — early access

SIGNAL
BEFORE THE
PRESS RELEASE

LeverageMode tracks environmental filings, building permits, and public inquiries for new AI data center sites across France and the EU — months before the groundbreaking photo. Every alert is confidence-scored and linked to its source.

>

Built for vendors selling into the buildout — not real estate funds.

Sample alert · illustrativeProbable
RegionHauts-de-France
Est. capacity180–260 MW
First signalICPE filing
Filer entitySPV — unresolved
Days pre-press~140
Evidence: 1 filing, 1 land parcel change. Awaiting corroboration before upgrading to Confirmed.

The reframe

EVERYONE FINDS OUT WHEN SOFTBANK DOES

By the time a €75B commitment makes Bloomberg, every vendor in Europe is calling the same three contacts. The real opportunity sits earlier — in ICPE environmental dossiers, Sitadel permit records, and enquêtes publiques — filed by SPVs nobody's heard of, for capacity nobody's announced yet.

How a signal becomes an alert

THE EVIDENCE CHAIN

01

Filing detected

An ICPE environmental filing, Sitadel building permit, or enquête publique notice is lodged for an industrial site with a high-power-draw classification.

02

Entity cross-referenced

The filer — often an unfamiliar SPV — is checked against BODACC incorporations, land registry, and prior filings to trace it back to a parent developer or operator.

03

Confidence scored

Capacity, site status, and corroborating signals (grid connection requests, hiring, press) combine into one of three tiers: Confirmed, Probable, or Speculative.

04

Alert delivered

Routed to saved triggers by region, capacity threshold, or tier — in your inbox or Slack, with a link to every source document behind the score.

No black-box scores

THREE TIERS. NOTHING HIDDEN.

Five to ten times more sites enter early filing than ever get built. Rather than pretend that noise doesn't exist, we show you exactly which tier a signal has earned — and every source behind it.

CONFIRMED

Multiple independent sources agree: permit, filing, and press or capex disclosure all point to the same site.

PROBABLE

Strong single-source evidence — an ICPE filing or enquête publique — without independent corroboration yet.

SPECULATIVE

Early filing only. Highest upside if it converts, highest chance it's shelved. Shown, never hidden.

Built for

WHOEVER SELLS INTO THE BUILDOUT

GET ON THE LIST

Early access opens region by region, starting with Hauts-de-France and Île-de-France. Sign up to be notified.

>